Commercial Estimating Services in Ohio
- New construction & tenant improvements
- Public & prevailing-wage bids
- Multi-trade or single-division pricing
- Formatted for your bid forms
Send Your Plans for a Fixed-Price Quote
- Upload plans, specs & addenda
- Approve your fixed quote
- Receive your estimate in 24–48 hrs
What Is Commercial Construction Estimating?
Commercial construction estimating is the process of quantifying and pricing every element of a non-residential building — sitework, structure, envelope, interiors, mechanical, electrical, plumbing and fire protection — along with general conditions, bonds, insurance, overhead and profit. The result supports a bid, a guaranteed maximum price (GMP), an owner’s budget or a lender’s cost review.
Commercial projects are larger and more coordinated than residential work, and they are bought in different ways. A hard-bid lump sum needs a complete, defensible number by bid day; a construction-manager-at-risk project needs estimates that track the design from schematics to GMP; a design-build team needs pricing that can steer design decisions. We structure every commercial estimate around how your project will actually be procured.
In Ohio, commercial buildings are governed by the Ohio Building Code (OBC), based on the International Building Code and adopted by the Ohio Board of Building Standards. Public improvements may also carry prevailing wage requirements, bonding and specific bid-form formats. Our estimators price all of it — and when you only need one scope, our MEP, electrical or drywall estimates are available on their own.
What does a commercial estimate include?
- GCs — hard bids & GMPs
- Subcontractors — trade packages
- Owners — budgets & checks
- Architects — design-phase costs
What Our Commercial Estimates Cover
- Division 01 requirements & general conditions
- Sitework, utilities, paving & landscaping
- Concrete foundations, slabs & tilt-up
- Structural steel, joists & metal deck
- Masonry, curtain wall & storefront
- Roofing, insulation & air barriers
- Doors, frames, hardware & specialties
- Drywall, ceilings, flooring & paint
- Fire protection & fire alarm
- Plumbing & HVAC systems
- Electrical, lighting & low voltage
- Alternates, unit prices & allowances
What you receive
- Excel estimate organized by CSI MasterFormat
- Marked-up takeoff drawings (PDF)
- Summary sheet with markups & contingency
- Labor, material & equipment breakdown
- Clarifications, exclusions & allowances
- Estimate class & basis-of-estimate notes
Commercial Projects We Estimate
Office & Corporate
Class A office buildings, corporate campuses, headquarters renovations and build-to-suit facilities.
Retail & Restaurants
Shopping centers, big-box stores, restaurants and drive-throughs, including shell and fit-out packages.
Healthcare & Medical Office
Medical office buildings, outpatient clinics, surgery centers and hospital renovations with heavy MEP.
Education & Public
K-12 schools, higher education, libraries, fire stations and municipal buildings, including public bids.
Hospitality & Mixed-Use
Hotels and mixed-use developments with retail at grade and residential or office above.
Tenant Improvements
Interior build-outs and renovations in occupied buildings, including phasing and after-hours work.
Commercial Estimating for Ohio Projects
Ohio’s commercial market is busiest where institutions and employers are growing: hospital systems in Cleveland, Columbus and Cincinnati, university campuses, suburban office and medical corridors in Dublin, Mason and Westerville, and mixed-use redevelopment in downtown cores. Each market has its own labor dynamics, and we price them accordingly.
Public work adds requirements. State and local public improvements above the statutory threshold generally require Ohio prevailing wages, set by county and trade, along with bid guarantees and performance bonds. State-assisted school construction coordinated through the Ohio Facilities Construction Commission (OFCC) follows its own design and procurement standards, and many owners now use construction-manager-at-risk or design-build delivery instead of traditional multiple-prime bidding. We package each estimate to match.
We also price the Ohio-specific details that change commercial budgets: winter enclosures and temporary heat, cold-weather concrete, Ohio and county sales tax on materials (including the construction contract exemption on qualifying exempt-owner projects), and local plan-review and permit fees.
Ohio factors we price in
- Ohio Building Code (OBC) requirements
- Prevailing wage by county & trade
- Bonds, bid guarantees & insurance
- OFCC and public bid-form formats
- Winter enclosure & temporary heat
- Sales tax & exempt-owner treatment
- Local plan-review & permit fees
What Drives Commercial Construction Costs in Ohio?
| Cost factor | Why it changes the estimate | How we price it |
|---|---|---|
| Delivery method | Hard bid, CM-at-risk, design-build and multiple-prime projects carry different risk, fees and contingency. | Estimate structured to the procurement method, with contingency and fee shown separately. |
| Structural system | Steel frame, cast-in-place concrete, tilt-up and wood or podium construction differ widely in cost and schedule. | Priced from the structural drawings; system comparisons available through value engineering. |
| Building envelope | Curtain wall, masonry, metal panel and EIFS each carry very different material and labor costs. | Envelope taken off by wall type and area with flashing, air barrier and insulation included. |
| MEP intensity | Healthcare, labs and restaurants carry far more mechanical and electrical cost per square foot than office or retail. | MEP priced from engineering drawings, or from stated design assumptions on early estimates. |
| Labor requirements | Prevailing wage, union labor or after-hours work in occupied buildings raises labor cost. | Labor rates applied by county and trade; phasing and premium time listed separately. |
| Schedule & season | Compressed schedules and winter work add overtime, heat, enclosures and general conditions. | General conditions priced from your schedule duration rather than a flat percentage. |
Commercial Estimating Guide for Ohio Owners and Contractors
Core & shell vs. tenant fit-out
General conditions are not a percentage
Healthcare and occupied-building work
Alternates and unit prices
How the Estimating Process Works
Send Your Plans
Fixed Quote
Takeoff & Pricing
Quality Review
Delivery & Support
Related Estimating Services in Ohio
Related services
Related trade estimates
Popular Ohio service areas
Commercial Estimating FAQs
Do you estimate prevailing wage projects in Ohio?
Yes. For public improvements covered by Ohio’s prevailing wage law, we apply the current rates for the project county and each trade classification, and we can show labor separately for certified payroll planning.
Can you prepare a GMP or CM-at-risk estimate?
Yes. We prepare design-phase estimates at schematic design, design development and construction documents, then a GMP estimate with clear qualifications, allowances and contingency. Our preconstruction services cover the full sequence.
Do you fill out our bid form?
We organize the estimate to match your bid form, alternates and unit prices so the numbers transfer directly. Final bid submission and signatures stay with your company.
How long does a commercial estimate take?
Typical commercial estimates take three to five business days depending on size and number of divisions. Single-trade commercial takeoffs are often delivered in 24–48 hours. Tell us your bid date when you send plans.
Can you estimate tenant improvements in occupied buildings?
Yes. TI estimates include demolition, protection, phasing, after-hours premiums and building-standard requirements from the landlord’s work letter when it is provided.
Do you work with subcontractors on commercial bids?
Yes. Many commercial clients are subcontractors who need one division priced — for example electrical, HVAC or drywall — formatted for the general contractor’s scope sheet.
Can you review contractor bids for an owner?
Yes. Our bid leveling service compares bids side by side against an independent estimate so owners can spot scope gaps and outliers before awarding.
Do you estimate core and shell separately from tenant fit-out?
Yes. We split the estimate into base building, common areas and tenant improvements to match how the project is financed and leased.
Can you estimate healthcare projects?
Yes. Healthcare estimates include infection control, phasing, after-hours work and the heavier MEP systems typical of clinical spaces.